Skip to main content

Featured

A $1 Septic Kit's Spreadsheet and Its Own Paper Form Disagree by 8.8% — I Rebuilt Both

The short version: I unzipped this $1 septic pumping kit, ignored every total it printed, and rebuilt all three of its worked quotes from its own rate card in Python. Three of three footed to the cent, and so did the 17-row startup ladder and the break-even arithmetic. Then I compared the kit's paper quote form against the kit's own calculator, and they disagree: the printed formula line has no zero-floor, so on a 950-gallon job inside both free mileage bands the form produces $206.15 while the spreadsheet produces $220.00 — $13.85 , 6.3 percent, in the customer's favour. I found one more documentation conflict and one band that its own cited source does not support. None of these figures is a market rate and none is an earnings claim. The kit, measured rather than read off a sales page The archive is 45,215 bytes, sha256 0fe37e1f…13b3 , twelve members with no nested folder — every file at the archive root. Eleven of them are Markdown or CSV and one is an XLSX, 82,22...

A $1 Tree Kit's Margin Floor Never Fires in Its Own Examples — I Found Where It Does

The short version: A $1 tree-service kit ships a hard rule — any estimate under a 0.35 margin rate gets re-priced or declined — and then ships five worked trees that run 68.15 to 77.08 percent. The floor never fires once in the entire example set. So I went looking for where it does fire, and it turns out to be a much lower price point than the examples imply: on the kit's own plan-month cost shape, an estimate loses money below h × dbh = 105.33 and slips under the floor below 162.05. I also found the six second-truck triggers are not the six independent tests they present themselves as. Every figure below is arithmetic at stated inputs. None of it is a market rate and none is an earnings claim.

Before the numbers, the disclosure, because it belongs at the top and not buried: this post links to a product we made, and if you buy through the link we may earn a commission at no extra cost to you.

What the thing actually is

The archive is 41,632 bytes, sha256 618ba5e4…05c949, seventeen files at the root with no nested folder. Thirteen Markdown files totalling 13,654 words, two CSVs, a licence and one Python checker. Zero external URLs anywhere in the kit — I regexed every file. self_qos.py imports exactly four modules, all standard library: csv, decimal, os, sys. It cannot phone home, because it has nothing to phone home with. That matters for a document product that claims to be plain files, because plain files that quietly fetch something are not plain files.

It runs eight self-checks and passes all eight. I did not take its word for that. I wrote my own verifier from scratch, importing nothing from the kit's checker, and re-derived every published number in Decimal with round-half-up: the five-job engine field by field, the crew rate chain, the P&L, the startup ladder for one to five trucks, the revenue ladder, the seeded job log, the break-even chain. 136 independent checks, all exact, zero deltas. The kit's arithmetic agrees with itself. That is a narrow claim and I will say so again later, because it is the only claim footing can make.

The margin floor, and why the examples can't show it working

File 02 sets the rule: "Margin floor: any estimate under a 0.35 margin rate gets re-priced or declined." File 05 repeats it as step 2 of the estimating SOP. It is a real guardrail and it is the sort of thing an owner-operator needs, because the failure mode in this trade is not quoting too high.

Then look at the five worked trees: 71.63, 77.08, 71.48, 68.15, 73.29 percent. The lowest is 33.15 points above the floor. Not one example demonstrates the rule doing anything. A reader who sanity-checks their own quote against the worked set learns that quotes land in the high sixties — and learns nothing about the shape of the cliff below that.

So here is the cliff, computed rather than sampled. With the engine's own constants and no situation flags, the total is just h × dbh × 1.95, and the job cost is hours × 42.16 + disposal + 0.78 × miles. The floor bites when cost exceeds 65 percent of the total:

Cost shapeJob costLoses money below
h × dbh
Under floor below
h × dbh
Kit's plan-month shape (3 h, $68 dump, 14 mi)205.40105.33162.05
Small ornamental, short run (2 h, $68, 10 mi)160.1282.11126.33
Heavy debris on a small tree (4 h, $95, 20 mi)279.24143.20220.31
Two-person crew, long drive (6 h, $68, 40 mi)352.16180.59277.84

And where real small trees land against the first row:

Treeh × dbhTotalMarginMargin %Verdict
12 ft × 8 in96187.20−18.20−9.72%Loss — decline
15 ft × 10 in150292.5087.1029.78%Under floor
18 ft × 12 in216421.20215.8051.23%ok
20 ft × 14 in280546.00340.6062.38%ok
24 ft × 16 in384748.80543.4072.57%ok
30 ft × 20 in (kit's J-001)6001,170.00964.6082.44%ok

The kit's smallest worked tree is h × dbh = 600, which is 3.7 times the floor threshold on its own cost shape. Every example sits comfortably in the safe zone. The floor is a genuine safeguard, but the shipped numbers never once exercise it, and an ornamental removal that a real one-truck company will absolutely be asked to quote is the exact case where it fires.

I want to be fair to the kit here, because the easy version of this criticism is wrong. The margin floor is not decorative: file 05 makes it step 2 of the quoting SOP, and the constants table lists it alongside the rates. What is missing is not the rule. What is missing is any example where the rule is the thing that saved you.

The second-truck triggers are not six independent tests

File 01 gives six triggers and says meet them all before you commit to truck two. Two of them are jobs-per-month thresholds, and they do not interact the way the list implies.

Trigger 1 is 15 or more billed jobs a month for 3 straight months. Trigger 3 is 20 or more billed jobs a month for a full quarter. If you satisfy trigger 3 — 20-plus a month across a quarter — you have necessarily satisfied trigger 1, because a quarter is three months and 20 is greater than 15. Trigger 1 can therefore never be the binding constraint. The real jobs test is 20 a month, and the list presents it as if 15 were a separate gate.

That is not hair-splitting, because of where 15 lands. The kit's own break-even is 14.10 jobs, rounded up to 15 whole jobs. So trigger 1 fires on the first profitable whole-job count and nothing more: 15 jobs a month clears fixed costs by about 1,134.24 against 17,870.76 of fixed costs. Trigger 1 is break-even wearing a green light.

Trigger 2 is the one that looks like a safety margin and is not:

LineValue
Trigger 2 threshold (75% of the one-truck plan)23,491.25
Expenses at that revenue (kit's expense base is fixed)21,318.41
NOI at that revenue2,172.84
Plan-month NOI10,003.26
Revenue down25.00%
NOI down78.28%

A 25 percent revenue miss costs 78 percent of the profit, because the expense base barely moves. That is operating leverage, and it is exactly what a "don't buy the truck too early" trigger is supposed to protect against. At trigger 2's own threshold the first truck is earning 2,172.84 a month, which needs 5.68 months of that performance just to cover truck two's low startup band of 12,350.00 — before the second truck's own overhead exists.

None of this makes the triggers wrong. It makes the presentation misleading: three gates that read as independent demand tests are, in order, break-even, a line at which four fifths of the profit is already gone, and the only test that actually binds.

The two frozen rounding ties, and why "just recompute it" fails

The kit freezes two half-up ties and tells you to copy them, never recompute. That instruction reads like fussiness until you test it:

TieExactDecimal half-upFloat formatted
J-004 access fee, 1,852.50 × 0.15277.875277.88277.88 ✓
2-truck at 75%, 62,643.34 × 0.7546,982.50546,982.5146,982.50 ✗

277.875 is 277 + 7/8, which is exactly representable in binary, so floating point agrees by luck of the tie's denominator. 46,982.505 is not exactly representable; the stored double is 46982.504999999997, which formats a cent below the frozen answer. Anyone who "simplifies" the kit by replacing its Decimal arithmetic with floats gets one of the two ties right and one wrong, and the wrong one is the one on the two-truck ladder. The kit's instruction is correct and it is correct for a reason that is testable.

Where the 43 checkboxes land, and what a checker cannot tell you

The licensing checklist carries exactly 20 checkboxes and the safety file exactly 23, both matching what the listing claims — I counted rather than trusted. The pipeline tracker's demonstration data foots too: seven leads, five won, one pending, one lost, a 71.43 percent win rate (5/7, exact), 15,412.48 quoted and 10,717.97 won, which is the same revenue total as the seeded job log. The tracker says in plain words that seven leads is a demonstration and not a statistic, which is the right thing to say and rare to see said.

And what footing cannot tell you: that a 20-cubic-foot load should cost what the kit's rate card says in your town, that your wage is 34.00, that your insurance is 1,450.00 a month, or that any of the mileage or disposal figures resemble your market. Footing proves the arithmetic agrees with itself. Given these inputs and this rate card, a stranger with a calculator reproduces every intermediate value. It does not prove the inputs are yours.

The kit is unusually direct about that. Every price in it is labelled an example figure to verify locally, the three-year financial slots are left deliberately blank with a note that invented numbers would only mislead, and the licence is plain personal use with no resale. There are no testimonials, no ratings, no customer counts and no revenue claims anywhere in the archive or on the listing — I looked for all of them.

Who it is NOT for

Be clear about this before you spend the dollar.

It is not for anyone who wants a price. If you want a number to quote for a specific tree in a specific town, this is the wrong product and no document can be the right one. It gives you a method whose outputs depend entirely on inputs you supply.

It is not software. There is no app, no account, no dashboard, no CRM integration, no map integration, no invoicing integration, no API. The files are Markdown, CSV and one Python script. If the checker needs python3 and you do not have it, the checker is the one part you cannot use — the rest is plain text.

It does not teach you to climb, rig or run a saw, and it says so itself. The safety file is framed on ANSI Z133 and states that it is business guidance and not a training course. Take actual training from qualified instructors and read the standard itself.

It gives no legal, tax, insurance, licensing or financial advice. The licensing checklist is explicitly a list of questions to ask your own state office, your own insurer and, at the stakes where it matters, your own attorney. Every line says verify local.

It does not price ground-level stump grinding. That is out of scope by design, and if stump work is your business this kit will not help with it.

The examples are US-shaped — dollars, ANSI Z133, ISA certification, state and local licensing. Outside the US, use the method and discard the figures and the compliance items.

The honest summary

The arithmetic is sound: 136 independent checks, zero deltas, standard library only, no network calls, no invented social proof. The reasoning has three soft spots I could measure. The margin floor is stated as a hard rule but never demonstrated by any shipped example, and it fires on ordinary ornamental work that the examples skip entirely. Two of the six second-truck triggers are the same gate wearing different numbers, and the one that looks like a 25 percent safety margin is the point where 78 percent of the profit is already gone. And the kit's own "copy the ties, do not recompute" instruction is not superstition — one of the two ties genuinely breaks under float arithmetic.

At a dollar, that is a fair trade: a method that foots, a real guardrail you have to go find the edges of yourself, and a checker that does what it says. It is not a shortcut past knowing your own market, and it does not pretend to be — which is more than most listings at any price manage.

What is in the package

Seventeen files at the archive root: README.md, START-HERE.md, LICENSE.txt, thirteen numbered documents covering planning, the estimate engine, a startup cost CSV, five worked estimates with a monthly P&L, seven SOPs, a marketing playbook, licensing and insurance, safety, a contract, three estimate forms, a job log CSV, a pipeline tracker and a seven-day launch plan — plus self_qos.py. No installation, no subscription, no account.

Product page: Tree Service Business Starter Kit on Gumroad.

Commission disclosure: this post links to a product we made and sell. If you buy through the link above we may earn a commission at no additional cost to you. We did not change the price, and the only figures we quote are the ones in the archive, measured from a clean unzip.

Honesty block. Example figures throughout this kit are illustrative planning inputs — not market rates and not earnings. The author provides no legal, tax, insurance, licensing or financial advice. The kit claims no CRM, map, API or invoicing integrations because it ships none. All names of people and businesses in the worked examples are fictional. Tree work is inherently hazardous; ANSI Z133 and your local rules are the floor, not a ceiling.

If you want the longer version of how a tree-service price is built line by line, there is a companion walkthrough of the eleven-line engine on the same blog. And if the pricing-method angle is what you came for, the junk-removal kit rebuild applies the same measurement discipline to a different trade's rate card. For the closest trade comparison, the roofing startup-cost model rebuild does the same thing to a 19-row CSV.

Comments